You are employed as a project manager for the Principal Contractor appointed to construct  a new-build project at a primary school situated on Pomona Street, Sheffield.

Part 1: Assignment Brief 

Assignment Scenario 

You are employed as a project manager for the Principal Contractor appointed to construct  a new-build project at a primary school situated on Pomona Street, Sheffield. The works  involve the construction of a new 2 storey teaching building (located in the land to the rear  of the existing school) as shown in figure 1 & 2. See appendix A for further site details,  boundaries and building specification. 

Task 1 

As part of the construction phase plan development, you have been asked to prepare a  proposal for the general site arrangements. This proposal aims to explain and justify your  choices, making links to specific safety legislation, site restrictions and the potential legal  implications of non-conformance. Your proposal must also be accompanied by a layout  plan to visualise these arrangements. 

Task 2

Further to proposing the general site arrangements, you are actively involved in planning  the installation of the first-floor to the new school building. This activity involves lifting approximately 100 number (200mm x 1200mm up to 8000mm) concrete hollowcore floor  planks into position on the steel frame. Figure 3 shows the layout, each concrete  hollowcore floor plank weighs approximately 3 tonne. 

Module Learning Outcomes 

1. Demonstrate critical understanding of UK health and safety legislation, regulations  and codes of practice, with particular regard to the Construction Design and  Management Regulations.  
2. Identify and analyse construction project hazards and apply robust risk assessment  practice to construction projects. 
3. Formulate Health and Safety plan for a construction project and demonstrate critical  understanding of UK construction project health and safety management planning  practice. 
4. Research and evaluate key issues in construction Health and safety management  practice and critically analyse real-life health and safety contraventions.  

Part 2: Assignment Supporting Information 

How to produce a good piece of work 

  • This assignment is intended to be a companion to the module lectures / seminars – do  not leave it until the end of the semester. 
  • Engage with resources and independently research.  
  • Fully acknowledge the sources of all cited information within the reference list
  • Ensure to provide appropriate support to your arguments, this is a proposal and would  need to be justified to your organisation / client